Installation of CCTV.

  • Installation, setting the DVR (4 channels) and hard disk recorder - 12$.
  • Installation, setting the DVR (8 Channel) and hard disk recorder - 13$.
  • Installation, setting the DVR (16 channels) and hard disk recorder - 15$.
  • Mounting power supply for CCTV system inside - 15$.
  • Installation of overhead distribution(switching) box for camera (Camera 1-1 junction box) - 7$.
  • Mounting power supply for CCTV street performance - 25$.
  • Installation and setup of cameras street - 30$.
  • Installation and setup of cameras inside the building - 20$.
  • Installation of street power unit to PTZ camera (a brick wall) - 35$.
  • Mounting shelves for recorder (monitor) on the brick wall - 20$.
  • Installation (BNC connectors) connectors on the ends of the cable (1videokamera-1 male) - 2$.
  • Installation IR sensor for video surveillance - 15$.
  • Installing and configuring the monitor for video surveillance system on the wall - 20$.
  • Wiring Surveillance System for Ceilings - 0.2$.
  • Wiring Surveillance System for the brick walls (box, gofratruba) - 0.5$.
  • Wiring Surveillance System on the walls of plasterboard (box, gofratruba) - 0.5$.
  • Making channel in brick walls under the wire - 2.5$.
  • Making channel in brick walls under the wire (with nasal wires before) - 4$.
  • Setting video surveillance system (up to 4 cameras) (including the Internet) - 85$.
  • Configure CCTV (5 to 8 cameras) (including the Internet) - 100$.
  • Configure CCTV (8 to 16 cameras) (including the Internet) - 120$.
  • Connection finished CCTV to the Internet - 60$.
  • Preparation.

  • Making channel in light walls under the wire - 2$.
  • Making channel in brick walls under the wire - 4$.
  • Making channel in concrete walls under the wire - 5$.
  • Drilling a deeper for box in the light walls - 2$.
  • Drilling a deeper for box into the brick wall - 3.5$.
  • Drilling a deeper for box into the concrete wall - 5$.
  • Installation of electrical boxes on plaster, plasterboard - 2$.
  • Installation of electrical boxes on the brick surface - 2.5$.
  • Open wiring on brackets on the walls gipsolitovyh - 1$.
  • Open wiring on brackets on the brick - 1.2$.
  • Open wiring on brackets on the concrete - 1.3$.
  • Installation cable channel on a concrete surface - 2$.
  • Laying cables in the final channel - UAH 0.5$
  • Setting sockets, switches - 3$.