Services for computers and equipment.

  • Configuring, set up the connection to the Internet - 15$.
  • Fast computer help - prompt resolution of technical issues that arise in users during making the operation of hardware and software - 20$.
  • Setting up access to printers, scanners, etc. - 15$.
  • Computer consulting - 2$ per hour.
  • Configuring, set up the connection to the Internet - 15$.
  • Server configuration is determined by the software package you want to install. For example setting of the next kit will go around you in - 100$: Linux or Unix OS, Apache server, MySql server, PHP and PHP accelerator, phpMyAdmin, Nginx, FTP.

    Services for the creation and development of Web-sites.

  • design and development of corporate websites - 200-300$;
  • design and development of flash websites - 400-800$;
  • design and development of unusual websites with Zend Framework, JQuery и MySql - from 500$;
  • unique design + coding based on useability и JQuery - 20-50$ per page;
  • development of technical specifications of the Web project - from 200$;
  • development of database structures - from 200$;
  • logo design - 40-60$;
  • banner design - 100-200$.
  • ervices for the construction of SCS and LAN.

  • Cross patching, cutting the cable for 1 port - 1$.
  • Crimping RJ-45 connection with testing 1pcs. - 1$.
  • Crimping RJ-11 connection with testing 1pcs. - 0.5$.
  • Wall mounting of cabinet 1pcs. - 20$
  • Installation of equipment in the closet (patch panel, organizer, active equipment, UPS) for 1 unit - 1$.
  • Installation of sockets:

  • Installation of socket (1 port RJ-45 (net) 1pcs. - 3$.
  • Installation of socket (2 ports RJ-45 (net)) 1pcs. - 5$.
  • Installation of socket (1 port RJ-11 (tel)) 1pcs. - 2$.
  • Installation of socket (2 ports RJ-11 (tel)) 1pcs. - 4$.
  • Installation of socket (RJ-45 (net)+RJ-11 (tel)) 1pcs. - 5$.
  • Installation of cable trays:

  • Punching concrete/brick walls 1 hole - 3$.
  • Punching walls made ​​of light materials 1 hole - 1.5$.
  • nstallation of cable channels (box, metal trays) on brick and concrete one meter - 1$.
  • Cable installation:

  • Cable installation one meter - 0.5$.
  • Laying the cable box / metal trays 1 meter - 0.25$.
  • The coefficient for the laying of the cable with a height of more than 3 meters - 1,5.
  • Factor for laying in hard (false ceiling, raised floor, for skirting.) - 1,5.
  • The coefficient for work on the streets in winter - 2.
  • The coefficient for work on the streets in summer - 1.5.